Scholl Canyon Landfill Storm Water Management

Client:County of Los Angeles, Department of Sanitation

Location:Glendale, CA

Description

This project consisted of construction a new storm water capture system to comply with new Industrial General Permit (IGP) requirements for storm water discharges issued by the State Water Resources Control Board. The system collects and stores storm water runoff from the Scholl Canyon Landfill site for discharge to an existing industrial waste sewer connection. The Project includes construction of a lined storm water storage basin, pump stations, pipelines, storm water conveyance channels and the associated electrical and instrumentation systems. The Project also modifies the existing storm water capture facilities at the project site to comply with the latest IGP requirements.